The Foundation of Reliable Manufacturing

Our Infrastructure

Three integrated facilities. One reliable outcome.

Manufacturing at scale requires infrastructure decisions made years before orders arrive. We established three campuses specifically to eliminate the capacity constraints that force other suppliers to say “not yet” when you need “now.”

Each facility handles distinct production stages while maintaining proximity for efficiency.

This arrangement means raw materials enter at one campus and finished products exit another, passing through defined quality checkpoints without external vendor dependencies. When production schedules tighten, we reroute internally rather than delay externally.

Our Scale

1.2 Million Sq. Ft.
Across Three Sites

.cls-1 { stroke: #fff; stroke-miterlimit: 10; stroke-width: .75px; }
1.2 Million Sq. Ft.
Across Three Sites

Dedicated zones for each production stage eliminate cross-contamination and maintain workflow efficiency. Raw material storage, work-in-progress areas, and finished goods warehousing operate independently.

900+ Manufacturing &
Quality Personnel

Production operators, machine technicians, quality inspectors, laboratory staff, and finishing specialists maintain operations across three shifts.

100% Solar Powered
Sustainable Operations

All facilities run on renewable solar power, reducing operational costs while eliminating grid dependency concerns.

Testing Happens Throughout, Not Just at the End.

Our in-house laboratory tests materials before production, samples during runs, and verifies products before dispatch. Testing covers yarn strength, dye fastness, shrinkage, and dimensional accuracy across all product categories.
Certifications & Compliance

Aligned With
International Standards

Every product at Sheen Tex India undergoes multi-step verification, in-house laboratory testing, and third-party validation before dispatch. Our certifications and quality management systems ensure consistency, safety, and compliance across all international markets.

Production Equipment

Machines That Don't Limit
What You Can Order

When your collection requires jacquard complexity, multi-needle density, or specialized backing, the equipment already exists. When volumes double mid-season, capacity headroom absorbs it without extending lead times. This isn’t flexibility we promise, it’s infrastructure you can verify before the first order ships

01Weaving

50 Shuttle-less Looms (high-speed fabric production)

110 Power Looms with Jacquard Attachments (pattern weaving)

10 Jumbo Jacquard Machines (complex designs)

Multi-Needle Machines: 560+ needles, 2.15m width

Tabletop Units: 300 four-needle machines for detailed work

Japanese High-Speed Machines: 4 units with 52 needles

Monthly Capacity: 200,000+ tufted pieces

200+ Industrial Sewing Machines configured for various fabric weights and product types

Handles envelope closures, zipper installations, button attachments, and reinforced seaming

4 Advanced Filling Machines for cushions, pillows, poufs

Capacity: 200,000+ filled products monthly

Automated weight calibration ensures fill consistency

Specialty Coating Plant: gel foam latex, hot melt, spray latex systems

Carpet Backing Technology for structural reinforcement

4 Metal Detection Units for final safety verification

Organized packing and dispatch zones

Journal

Thoughts, process and inspiration behind the products we create.